|
Text size:
|
The proposed Tuas West Mass Rapid Transit Extension Depot is located at Tuas West Road and it is JURONG Primewide's first project with LTA. Forming part of the tender requirements of Contract 1685 is the Design and Build of a new bus terminal to be located on a section of the proposed Rapid Transit System (RTS) depot building roof slab.
The area designated for the proposed bus terminal is approximately 10,000 sq metres which shall be accessible, primarily, via a ramp structure connecting directly to Tuas West Drive. Alternatively, the site can also be accessible via another ramp structure connecting to Tuas Link 4.
The proposed bus terminal consists of 2 major elements. One is the bus terminal building and the other is the bus parking area. For security reasons, the bus terminal, including its driveways and bus parking area is intended to be fully lockable and secured against illegal entry after operation hours and is intended to be maintained as restricted and controlled area with no access by unauthorized personnel.
The bus terminal have a naturally ventilated Concourse Area with facilities such as 2 numbers of Passenger Service Offices, 2 separate Offices for Main and Secondary Operators, Administrative Office, Staff Lounge, Canteen, Servery, Rodent Free Store Room, Technician’s Room, Store Room, Cleaner’s Room, Switch Room, Toilet Facilities, Bin Centre, Staff Briefing Room and First Aid Room. A 10-passenger lift connecting the ground level and the bus terminal level is also provided.
